Custom tools

Our production capacities can be briefly represented in the following numbers:

  • custom tools constitute over 40% of all produced items;
  • quantity of custom products — over 30 000 pcs a year;
  • minimum order quantity — 1 pc;
  • average production time for uncoated custom tools — 7 days; coated — 14 days;
  • minimum production time — 3 days, maximum — 3 weeks (for complex items).

All the required steps for custom tool design can be narrowed down to the following two:

  • select a drawing and downloaded it;
  • complete the drawing (pop-up prompts will guide you) and send it to us via email.

The best compatibility is provided by Adobe Acrobat Reader.